Design Diary: Bit by Bit

Many people have been asking me how the job on the Upper West Side is going. It’s speeding along. If you recall, in February 2011 the client asked me to evaluate the property. Based on the online profile I thought it was a waste of time. Once I went there,  I could see the possibilities. High ceilings, great garden, and with a complete rethinking it could be very special.

Two weeks ago, I went by late at night after a movie to show my friends. One of them had previewed the apartment with me on my first visit.

Based on the state of the project at that point my friends were skeptical. Now, two weeks later, much has been accomplished. The radiant heating is installed; the bleached ash floors are down; the kitchen is almost all installed; the countertops have been templated; the sliding glass doors are almost done; much of the cabinetry is installed; the painting is almost finished; the doors are all done and being finished; and the mirrors are ordered.

The move in date is set for August 22, and we are in good shape. Like all good shows, everything comes together at the last minute. Here are a few progress shots.

Angled ceiling with exposed support column

Angled ceiling with exposed support column

Angled wall in living room that incorporates the home office and kitchen

Angled wall in living room that incorporates the home office and kitchen

Home office for a writer

Home office for a writer

Kitchen being installed by Lucenti Altay

Kitchen being installed by Lucenti Altay

Living Room sliding doors  being installed

Living room sliding doors being installed

Living room with wall removed for installation

Living room with wall removed for installation

Master bath with marble tile from Artistic Tile

Master bath with marble tile from Artistic Tile

Doors!

Doors!

 

This entry was posted in Apartment Design, Design Diary, Upper West Side. Bookmark the permalink.